January 15, 2023
Description
I thought the designs I had seen for dry boxes could use some improvement for one reason or another. So, for this project I made new files with some improvements and put all the files you need for a complete a dry box in one place.
Filaments pass-through guide (3 parts)
Spool holders (with press fit points for 608 ball bearings)
Spool axle supports
Links for some of the purchased hardware are below. Other purchased hardware can be for at most hardware stores.
Optional purchased hardware:
Find a good height for the axle supports in your storage tub, make sure its low enough so the lid can be closed when a spool is on the holder. Use the support as a guide to mark the locations for the bolt holes, do that for both sides. After drilling holes, the axle supports can be attached, each one needs four M4x0.7 machine screws and four M4x0.7 hex nuts. Optionally you can use four M4 washers and silicone sealant to make the mounting air tight. Once both Axle supports are installed measure the distance between them and then cut the 8mm axle rod to length, if the walls of your storage tub are flexible make the rod a little longer (3-5mm).
For each Spool holder press fit a 608-ball bearing into the recessed pocket.
Each pass-through guide requires four M4x0.7 machine screws, four M4x0.7 hex nuts, and optionally four M4 washers and silicone sealant to make it air tight. Use the outer guide to mark the hole locations and then drill the holes (I put the pass-through guides on the lid of my dry box, but the side of the tub will also work). After the inner and outer pass-through guides are attached, screw in the push joints if your going to use them. The pass-through caps can cover any pass-through not currently being used and there large enough to cover the push fittings.
License:
Creative Commons — Attribution — Noncommercial
7