July 9, 2025
Description
Hier findest du meine → Windmühlen
🖨️ 3D Printed Parts
Part 1 – Hub
Part 2 – Axle
Part 3 – Rotor
Part 4 – Blades (×3)
Part 5 – Rear-Hub
Part 6 – Fin-Mount
Part 7 – Fin
Part 8 – Mount (for 10 mm Stick)
🧩 Non-Printed Components
8× 3×8 mm SHCS self-tapping screws
2× MR128 ball bearings (8 mm ID × 12 mm OD × 3.5 mm height)
🛠️ Tools Required
Large hex key (included in Bambu Lab Tool Set)
🔧 Step-by-Step Assembly Guide
Step 1 – Assemble the Hub
Take Part 1 (Hub) and screw it firmly into Part 2 (Axle).
Make sure the axle is centered and tightly fixed in the hub.
Step 2 – Attach the Blades
Secure the 3× Part 4 (Blades) to Part 3 (Rotor) using screws.
Step 3 – Insert Bearing into Blademount
Press the first MR128 bearing into Part 3 (Rotor).
The bearing only fits from one side – make sure it is fully inserted.
Then slide the blademount onto Part 2 (Axle).
Step 4 – Assemble Rear-Hub
Insert the complete front assembly (Hub, Axle, Rotor, Blades) into Part 5 (Rear-Hub) via the axle.
From the bottom, screw the axle into place.
Step 5 – Attach the Fin-Mount
Insert Part 6 (Fin-Mount) into the back of Part 5 (Rear-Hub).
Secure it from the top using two screws.
Step 6 – Mount the Fin
Attach Part 7 (Fin) to Part 6 (Fin-Mount) using two screws.
Make sure the fin is upright and aligned.
Step 7 – Final Assembly on the Base
Insert the second MR128 bearing from the bottom into Part 5 (Rear-Hub).
Place the complete assembly onto Part 8 (Mount).
✅ Final Check
Ensure that:
Part 3 (Rotor) rotates freely around the Axle.
The entire top assembly rotates smoothly on Part 8 (Mount) using the lower bearing.
License:
Standard Digital File License